- Project Location: Dawson Creek, BC, Canada
- Year Built: 2017
- Mass-Timber Project with 43 Parts of Glulam Beams, Glulam Volume 49m3 and 1103 CLT Panels, CLT Volume 800m3 and 2510 HVB-Beams, HVB Volume of 498 m3
- Mass-Timber Supplier: Binderholz, Austria & Brisco Manufacturing Ltd., BC Canada
- Client: Brisco Manufacturing LTD
Lignum Design Ltd. was working together with Project Architects, Engineers, Suppliers, Contractors and Subtrades.
Project Details
Lignum Design Ltd. was responsible for the design Mass-Timber scope on this project.
We provided the client with shop drawings, PbP-drawings for hand-cutting, Install drawings, Beam Lists, Hardware lists, manufacturing drawings for all the weld assemblies required to install the Mass-Timber components.